
Loading containers in China, August 2024
On 9 and 10 August 2024 AdamsGames' containers were loaded in a supplier's yard in China. Two days of loading, bound for Thessaloniki. The equipment was our own: we chose it, bought it and imported it ourselves.

Why it matters to be there for the loading
A container from China to Thessaloniki travels for weeks, by ship, with transhipment and a lorry leg. Whatever isn't secured properly from the start arrives damaged. And damage to an amusement machine rarely shows on the outside: the frame warps, the coin mech fails, a weld cracks.
That's why we don't leave loading to the supplier. Heavy loads are strapped to the container floor and the gaps are filled with timber beams so nothing can shift. Fragile parts travel whole, not taken apart. One stand went in wrapped as a single package, for exactly this reason.

Whole containers, not single orders
A loading like this isn't done for one machine. Whole containers leave together. That way we have machines and spare parts available, without waiting on a third party every time we need something.

For the customer the difference is practical: when a machine breaks down at an event or in an indoor playground, the spare part is already in Thessaloniki. We don't order it from China while the venue is closed.

The equipment that reaches indoor playgrounds, hotels and events passes first along this route. We choose it at the production line, load it under our own supervision and support it here. What we can guarantee in amusement machine rental in Thessaloniki depends on this too.